1) Plastering with any mortar 12mm (5”) thick – 3 masons, 3 mazdoors and 1 bhisti can plaster 40sqm (400a ft) per day.

How many square meters of plastering can 1 Mason a day?

ft~12.00sq. m per day. In high rise buildings the plastering out put will decrease with increasing height of floor on which the mason has to work due to the wind, personal safety considerations and the weather . Here usually an output of about 60sq.

How do you calculate plastering work?

Mortar Calculation for Plastering work

  1. Density of Cement = 1440 kg/m3.
  2. Sand Density = 1450-1500 kg/m3.
  3. Density of Aggregate = 1450-1550 kg/m3
  4. How many KG in 1 bag of cement = 50kg.
  5. Cement quantity in litres in 1 bag of cement = 34.7 litres.
  6. 1 Bag of cement in cubic metres = 0.0347 cubic meter.
READ ALSO:   Is destroyer stronger than Thanos?

How do you calculate plaster per square meter?

Calculation of quantity of material for 12 mm thick plaster of ratio 1: 6 (1 Cement:6 Sand) in the wall for 100 Sqm

  1. Quantity of Cement = 2/(1+6) × 1 (1 Ratio of cement)
  2. In Kg = 0.30 × 1440 (Density of cement = 1440 kg/m3)
  3. Quantity of Sand = 2/(1+6) × 6 (6 Ratio of sand)
  4. In Cubic Feet = 63.558 cft (1 Cum = 35.31 cft)

What is the Labour cost for plastering?

Wall Plaster Cost For 1000, 2000, 3000,4000, & 5000 sq. ft area

Description Rate Per sq.ft 2000 sq.ft
Wall Plaster Labour Rs.25/- per sq.ft Rs.25/-* Rs.50,000
Material Cost (Plastering M-Sand, Cement) – Rs.35/- per sq.ft Rs.35/-* Rs.70,000
Total Cost of Wall Plaster Rs.60/- per sq.ft Rs.60/-* Rs.1,20,000/-*

How long does it take to plaster 2 walls?

Old plaster will require a skip for disposal and this may increase the overall cost of the job. A typical plastering job will last between 2 and 4 days.

What is the formula for wall plaster?

For wall plaster generally ratio we use = 1: 6 (1 part of cement and 6 part of sand). For Roof plaster mainly ratio we use = 1: 4 (1 part of cement and 4 part of sand). The thickness of plaster is between = 12 mm to 15 mm. Always use good quality cement (Different grades of cement) as well as good quality sand.

READ ALSO:   Why do 120Hz TVs look weird?

How is Labor constant calculated?

Labour constants are a guide of productivity and may be expressed as a quantity of: Hours per unit (or minutes or days per unit); or. Units per hour (or units per minute or day)….Labour Constants.

Item Unit Labour hours per unit *
Fix vanity basin in place Each 0.80
Hang solid core standard door on 3 hinges Each 1.50

How do you calculate wall plastering?

How to Plaster Calculation for Wall

  1. Length of Plaster = 10 m.
  2. Width of Plaster = 10 m.
  3. Thickness of Plaster = 12 mm.
  4. Cement Sand Ratio for Plastering = 1:6.
  5. Total Plaster Area = 100 m2
  6. Volume of Cement Mortar Required = Area of Plaster x Thickness.
  7. Volume of Cement Mortar Required = 100 x (12/1000) = 1.2 m2 (Wet Volume)

How much plastering can you do in a day?

1) Plastering with any mortar 12mm (5”) thick – 3 masons, 3 mazdoors and 1 bhisti can plaster 40sqm (400a ft) per day. 2)White washing or colour washing (3 coats) – 1 white washer and 1 mazdoor can do 60sqm (600sqft) per day.

READ ALSO:   What are the roles of a boy and a girl at home?

What is the labor cost of inner wall plastering in India?

If there is potential for getting more work thru reference. Labour cost for inner wall Plastering = Rs.15 to 18 /Sqft (Material should be given from Client) Labour cost for Brick Masonry = Rs.26 to 30/Sqft (Material should be given from Client) 8 clever moves when you have $1,000 in the bank.

What is the labor cost of brick masonry and plastering?

Labour cost for Brick Masonry = Rs.26 to 30/Sqft (Material should be given from Client) Labour cost for Plastering = Rs.15 to 18 /Sqft (Material should be given from Client) Labour cost for Brick Masonry = Rs.26 to 30/Sqft (Material should be given from Client)

How many skilled labor required for plastering work in Nepal?

As per Norms for Rate Analysis as per Standard Specification for Road and Bridge Works of Department of Roads, Nepal 12 numbers of skilled labor and 16 numbers of unskilled labor is required for 100 sq. meters area of plastering work of 12.5 mm thickness